Correct installation method of precision planetary reducer
New products, new design, precision planetary gear reducer with a series of products has a very good choice for the enterprise, also very popular and widely used, then planetary reducer is properly installed, use and maintenance should pay attention to the details of what? How do you install it? How to use it? Today, the East Chen reducer gives you a brief introduction. Because planetary reducer installation, use, maintenance properly, is an important link to ensure the normal operation of machinery and equipment. Therefore, in the installation of planetary reducer, please be sure to pay attention to, strictly refer to the following installation and use of related matters, seriously assembled after use.
Planetary reducer cylindrical shell, small size, compact structure, output end connection, easy installation.
1, first of all must confirm the motor and planetary reducer is in good condition, and must check the motor and reducer connected to each part of the size match.
2. Screw down the screw on the outer side of the flange of the reducer flange, adjust the clamping ring of the PCS system, align the side hole with the dustproof hole, and insert the inner six corners to tighten. After that, remove the motor shaft key. Before the installation of precision planetary reducer, remember that the motor input shaft, positioning lug and reducer connecting parts of the anti rust oil with gasoline or zinc sodium water wipe clean.
3, the motor and reducer into a natural connection. When connecting, the output shaft of the reducer must be concentric with the input shaft of the motor, and the two outer flanges are parallel, so that the service life can be prolonged, and the ideal transmission efficiency and lower noise can be obtained. In addition, the hammer is not allowed to be struck during installation, so that the axial force or radial force is too large to damage the bearing or gear. Be sure to tighten the mounting bolts and tighten the bolts.
4, after installation, hand rotation should be flexible, no stuck phenomenon. The fastening screws should be fastened before starting up, the no-load test should be no less than 2 hours, the operation should be smooth, no impact, vibration, noise and oil leakage phenomenon, should be promptly removed when found. The fasteners should be checked regularly to ensure the normal operation
No matter how good the machine is need maintenance and maintenance, and the correct use to extend the service life, play the greatest use value, bring the greatest benefit to the enterprise.